This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

UTM 9 Up2Date from 8.305

Any idea when we can expect to see the Up2Date package for systems running 8.305?


This thread was automatically locked due to age.
Parents
  • I've long said 2 gigs is the minimum with 4 being the real world usage.  I've also long talked about how swap in Linux is not like swap in windows...[:)]. Have you totally written off astaro?  If can we talk about a software version install on a properly sized dell or HP server?

    Owner:  Emmanuel Technology Consulting

    http://etc-md.com

    Former Sophos SG(Astaro) advocate/researcher/Silver Partner

    PfSense w/Suricata, ntopng, 

    Other addons to follow

Reply
  • I've long said 2 gigs is the minimum with 4 being the real world usage.  I've also long talked about how swap in Linux is not like swap in windows...[:)]. Have you totally written off astaro?  If can we talk about a software version install on a properly sized dell or HP server?

    Owner:  Emmanuel Technology Consulting

    http://etc-md.com

    Former Sophos SG(Astaro) advocate/researcher/Silver Partner

    PfSense w/Suricata, ntopng, 

    Other addons to follow

Children
  • I've long said 2 gigs is the minimum with 4 being the real world usage.  I've also long talked about how swap in Linux is not like swap in windows...[:)]. Have you totally written off astaro?  If can we talk about a software version install on a properly sized dell or HP server?


    Interesting, I have plenty of old decommissioned Dell servers kicking around with significantly more processor and memory capacity.  I only use two network interfaces on the 220s anyway.  This is an option I really haven't considered.

    I do like the software (faster updates would be nice but the design is solid), I was just frustrated that I was stuck with such a ridiculous issue of insufficient RAM.  Please tell me a bit more about how this would work.  Would I be able to shift my current subscriptions and annual support.  How much would it cost to transition from three ASG 220s to three software-based setups.  What do I lose by going with just software rather than a full hardware/software setup?

    I do not have any discretionary funds but this might give me something to budget and work towards that is more reasonable than the cost of full device replacement.