Our setup looks like this
uplink -> stacked cisco 2960's -> primary/standby astaro v8
astaro1 switch1
astaro2 switch2
The switches are setup in a stack. So we have been testing failover and if we lose an astaro we are ok but losing the master switch we get around 2 minutes of downtime. I'm woring is it possible to create a bond on the WAN device so i can go from
astaro1 eth1 -> switch1 port 1
astaro1 eth5 -> switch2 port 2
astaro2 eth1 -> switch2 port 1
astaro2 eth5 -> switch1 port 2
If I am not explaining myself good enough let me know
thanks!
This thread was automatically locked due to age.