I have a ACC 1.401 running in a virtual machine on a Microsoft Virtual Server 2005 R2. So far so good. When I schedule a patch installation on one of my ASGs using ACC the job runs 3,5 hours before the actual scheduled time.
How can I correct the time on my ACC ?
This thread was automatically locked due to age.