Hello, we have 2 XG550's in an A/P HA cluster running v17.5 MR12. We've got some new Flexi modules to install but according to the instructions it requires the units to be powered down. On top of that, HA requires similar hardware, making it seem like you have to install the modules all at once.
I've found a few methods in this link:
However this is for UTM, and there are some contradictory statements in there too. We've got 24x7 departments so the goal is to minimize disruptions. Can this be done with no downtime or HA "going crazy" as stated in the forum post above?
This thread was automatically locked due to age.